Veritas NetBackup™ 5330 Appliance Hardware Installation Guide

Last Published:
Product(s): Appliances (Version Not Specified)
Platform: 5330
  1. Hardware overview
    1.  
      NetBackup 5330 compute node overview
    2.  
      NetBackup 5330 compute node PCIe card configurations
    3.  
      NetBackup 5330 compute node Ethernet port configurations
    4.  
      NetBackup 5330 storage shelves and disk drives
    5.  
      NetBackup 5330 cables and connectors
    6.  
      Serial number locations
    7.  
      Required reading
    8.  
      Understanding hardware scenarios
    9.  
      Understanding the NetBackup 5330 hardware installation sequence
    10.  
      About IPMI configuration
    11.  
      Other NetBackup 5330 product documentation
  2. Pre-installation requirements
    1.  
      Package contents for NetBackup 5330 hardware
    2.  
      Customer-provided items for a NetBackup 5330 hardware installation
    3.  
      Unpacking a primary shelf or an expansion shelf
    4.  
      Unpacking a compute node
    5.  
      Determining rack locations
    6.  
      Determining SAS2 cable length
    7.  
      Prerequisites for IPMI configuration on a 52xx and 5330
  3. Hardware installation procedures
    1.  
      Hardware installation scenarios
    2.  
      Installing a primary shelf or an expansion shelf
    3.  
      Installing disk drives into a primary shelf or an expansion shelf
    4.  
      Installing the compute node
    5.  
      Installing the SFPs into the Fibre Channel (FC) ports
    6.  
      Connecting a NetBackup 5330 compute node to a primary shelf
    7.  
      Connecting one expansion shelf to a primary shelf
    8.  
      Performing a soft shutdown before adding a new expansion shelf
    9.  
      Connecting new expansion shelves to existing expansion shelves and an existing primary shelf
    10.  
      Connecting the power cords to the hardware
    11.  
      Turning on the hardware and verifying operation
    12.  
      Configuring the IPMI port from the NetBackup Appliance Shell Menu
    13.  
      Accessing and using the Veritas Remote Management interface
  4. Hardware installation procedures for a NetBackup 5330 high availability configuration
    1. Hardware installation scenarios for a NetBackup 5330 high availability configuration
      1.  
        Installation procedures for a new deployment of a high availability configuration
      2.  
        Installation procedures for converting existing systems to a high availability configuration
    2.  
      Connecting the partner node to the Primary Storage Shelf
    3.  
      Connecting two nodes for HA communication
    4.  
      Verifying the hardware installation of a high availability configuration
  5. Appendix A. Adding the disk space of a new Expansion Storage Shelf
    1.  
      Prerequisites for adding the disk space of new expansion shelves
    2.  
      Adding the disk space of an Expansion Storage Shelf from the NetBackup Appliance Web Console
    3.  
      Adding the disk space of an Expansion Storage Shelf from the NetBackup Appliance Shell Menu

Package contents for NetBackup 5330 hardware

Each node and the storage shelves are shipped in separate containers. Each container includes other boxes and contents. The disk drives for the storage shelves are shipped in additional boxes.

Table: NetBackup 5330 compute node container contents describes the contents of the shipping containers for a NetBackup 5330 appliance system.

Table: NetBackup 5330 compute node container contents

Container

Contents

Compute node

  • Cable connections poster

  • Deployment guide

  • Safety manual

  • Left and right rack rails

  • Rack mounting template

  • Compute node

  • Bezel

  • Four Fibre Channel cables

  • Four SFPs

  • Two Ethernet cables for the high availability configuration

  • Two power cords

  • Cable straps

  • Envelope containing the following:

    • USB stick(s) with factory reset files.

    • Warranty and license information

Primary Storage Shelf

  • Left and right rack rails with mounting hardware

  • Rack rail mounting template

  • Bezel

  • Primary Storage Shelf

  • Two SAS2 cables

  • Two power cords

Expansion Storage Shelf

  • Left and right rack rails with mounting hardware

  • Rack rail mounting template

  • Bezel

  • Expansion Storage Shelf

  • Two SAS2 cables

  • Two power cords