- Hardware overview
- NetBackup 5330 compute node overview
- NetBackup 5330 compute node PCIe card configurations
- NetBackup 5330 compute node Ethernet port configurations
- NetBackup 5330 storage shelves and disk drives
- NetBackup 5330 cables and connectors
- Serial number locations
- Required reading
- Understanding hardware scenarios
- Understanding the NetBackup 5330 hardware installation sequence
- About IPMI configuration
- Other NetBackup 5330 product documentation
- Pre-installation requirements
- Hardware installation procedures
- Hardware installation scenarios
- Installing a primary shelf or an expansion shelf
- Installing disk drives into a primary shelf or an expansion shelf
- Installing the compute node
- Installing the SFPs into the Fibre Channel (FC) ports
- Connecting a NetBackup 5330 compute node to a primary shelf
- Connecting one expansion shelf to a primary shelf
- Performing a soft shutdown before adding a new expansion shelf
- Connecting new expansion shelves to existing expansion shelves and an existing primary shelf
- Connecting the power cords to the hardware
- Turning on the hardware and verifying operation
- Configuring the IPMI port from the NetBackup Appliance Shell Menu
- Accessing and using the Veritas Remote Management interface
- Hardware installation procedures for a NetBackup 5330 high availability configuration
- Appendix A. Adding the disk space of a new Expansion Storage Shelf
Connecting the partner node to the Primary Storage Shelf
The following figure shows the locations of the FC ports in the partner node.
The following figure shows the locations of the FC ports Ch3 and Ch4 in the canisters A and B of the Primary Storage Shelf.
To connect the partner node to the Primary Storage Shelf
- Connect the slot 1 FC ports on the partner node to the following Primary Storage Shelf canister FC ports:
Connect partner node slot 1, port 2 to Primary Storage Shelf canister B, FC Ch3.
Connect partner node slot 1, port 1 to Primary Storage Shelf canister A, FC Ch3.
- Connect the slot 4 FC ports on the partner node to the following Primary Storage Shelf canister FC ports:
Connect partner node slot4, port 2 to Primary Storage Shelf canister B, FC Ch4.
Connect partner node slot 4, port 1 to Primary Storage Shelf canister A, FC Ch4.
- Verify that the connections match the ports in the following diagram.