- Hardware overview
- Pre-installation requirements
- Hardware installation procedures
- Hardware installation procedures for a NetBackup 5330 high availability configuration
- Appendix A. Adding the disk space of a new Expansion Storage Shelf
Verifying the hardware installation of a high availability configuration
Verify that the connections match the ports in the following diagram for the hardware installation of a high availability (HA) configuration:
When all the cables are connected properly, connect the power cords to the hardware, turn on the hardware, and verify the connections. If the connections are correct, configure the IPMI port and the NIC1 (eth0) interface.
See Connecting the power cords to the hardware.
See Turning on the hardware and verifying operation.