Veritas NetBackup™ 5330 Appliance Hardware Installation Guide
Last Published:
2018-09-21
Product(s):
Appliances (Version Not Specified)
Platform: 5330
- Hardware overview
- Pre-installation requirements
- Hardware installation procedures
- Hardware installation procedures for a NetBackup 5330 high availability configuration
- Appendix A. Adding the disk space of a new Expansion Storage Shelf
Customer-provided items for a NetBackup 5330 hardware installation
The following describes the necessary personnel and equipment that are needed at the installation site:
At least three people or a mechanical lift to move the storage shelves.
A keyboard and a monitor to connect to the compute node.
Ethernet and Fibre Channel (FC) cables to connect the compute node to your corporate network.
A 19-inch rack with dual Power Distribution Units (PDUs).
220VAC power supply for the Primary Storage Shelf and the Expansion Storage Shelf
120VAC or 220VAC power supply for the nodes