Please enter search query.
Search <book_title>...
Veritas NetBackup™ 5330 Appliance Hardware Installation Guide
Last Published:
2018-09-21
Product(s):
Appliances (Version Not Specified)
Platform: 5330
- Hardware overview
- NetBackup 5330 compute node overview
- NetBackup 5330 compute node PCIe card configurations
- NetBackup 5330 compute node Ethernet port configurations
- NetBackup 5330 storage shelves and disk drives
- NetBackup 5330 cables and connectors
- Serial number locations
- Required reading
- Understanding hardware scenarios
- Understanding the NetBackup 5330 hardware installation sequence
- About IPMI configuration
- Other NetBackup 5330 product documentation
- Pre-installation requirements
- Hardware installation procedures
- Hardware installation scenarios
- Installing a primary shelf or an expansion shelf
- Installing disk drives into a primary shelf or an expansion shelf
- Installing the compute node
- Installing the SFPs into the Fibre Channel (FC) ports
- Connecting a NetBackup 5330 compute node to a primary shelf
- Connecting one expansion shelf to a primary shelf
- Performing a soft shutdown before adding a new expansion shelf
- Connecting new expansion shelves to existing expansion shelves and an existing primary shelf
- Connecting the power cords to the hardware
- Turning on the hardware and verifying operation
- Configuring the IPMI port from the NetBackup Appliance Shell Menu
- Accessing and using the Veritas Remote Management interface
- Hardware installation procedures for a NetBackup 5330 high availability configuration
- Appendix A. Adding the disk space of a new Expansion Storage Shelf
Prerequisites for adding the disk space of new expansion shelves
Verifying functionality
Before you add the disk space of a new expansion shelf you must make sure that the entire appliance system operates correctly.
To verify appliance functionality
- Verify that the compute node power supply LEDs are green.
- Verify that the compute node disk drive LEDs are green.
- Verify that the compute node LEDs on the front panel are green.
- Verify that the primary shelf and the expansion shelf front panel LEDs are green.
- Verify that the primary shelf and the expansion shelf drawer LEDs are green.
- Verify that the primary shelf and the expansion shelf power canister LEDs are green.
- Verify that the primary shelf and the expansion shelf fan canister LEDs are green.
- Verify that the primary shelf displays 99.
- Verify that the first expansion shelf displays 00.
- Verify that the second expansion shelf displays 01.