Veritas NetBackup™ 5330 Appliance Hardware Installation Guide
Last Published:
2018-09-21
Product(s):
Appliances (Version Not Specified)
Platform: 5330
- Hardware overview
- NetBackup 5330 compute node overview
- NetBackup 5330 compute node PCIe card configurations
- NetBackup 5330 compute node Ethernet port configurations
- NetBackup 5330 storage shelves and disk drives
- NetBackup 5330 cables and connectors
- Serial number locations
- Required reading
- Understanding hardware scenarios
- Understanding the NetBackup 5330 hardware installation sequence
- About IPMI configuration
- Other NetBackup 5330 product documentation
- Pre-installation requirements
- Hardware installation procedures
- Hardware installation scenarios
- Installing a primary shelf or an expansion shelf
- Installing disk drives into a primary shelf or an expansion shelf
- Installing the compute node
- Installing the SFPs into the Fibre Channel (FC) ports
- Connecting a NetBackup 5330 compute node to a primary shelf
- Connecting one expansion shelf to a primary shelf
- Performing a soft shutdown before adding a new expansion shelf
- Connecting new expansion shelves to existing expansion shelves and an existing primary shelf
- Connecting the power cords to the hardware
- Turning on the hardware and verifying operation
- Configuring the IPMI port from the NetBackup Appliance Shell Menu
- Accessing and using the Veritas Remote Management interface
- Hardware installation procedures for a NetBackup 5330 high availability configuration
- Appendix A. Adding the disk space of a new Expansion Storage Shelf
Customer-provided items for a NetBackup 5330 hardware installation
The following describes the necessary personnel and equipment that are needed at the installation site:
At least three people or a mechanical lift to move the storage shelves.
A keyboard and a monitor to connect to the compute node.
Ethernet and Fibre Channel (FC) cables to connect the compute node to your corporate network.
A 19-inch rack with dual Power Distribution Units (PDUs).
220VAC power supply for the Primary Storage Shelf and the Expansion Storage Shelf
120VAC or 220VAC power supply for the nodes