Veritas NetBackup™ 5240 Appliance Hardware Installation Guide
- Hardware overview
- Preinstallation requirements
- Customer-provided environment and supplies
- Storage shelf shipping container contents
- Appliance shipping container contents
- Enabling SAS tape-out functionality
- Determining rack locations
- Best practices for rack installation
- Heat dissipation
- Verifying SAS-3 cable length
- Prerequisites for IPMI configuration on a 52xx and 5330
- Installation procedures
- Installing the storage shelf rack rails
- Installing the storage shelf into a rack
- Installing the appliance rack rails
- Installing the appliance into a rack
- Attaching the storage shelf bezel
- Understanding appliance and storage shelf connections
- Connecting an appliance to one storage shelf
- Connecting an appliance to more than one storage shelf
- Connecting the network cables
- Connecting the power cords
- Turning on the hardware and verifying operation
- Configuring the IPMI port from the NetBackup Appliance Shell Menu
- Accessing and using the Veritas Remote Management interface
- Appendix A. Adding one or more storage shelves to an operating appliance that does not have any storage shelves
- Overview
- Preparing the appliance
- Removing the appliance cover
- Installing the Expansion Storage Kit components
- Reinstalling the appliance into the rack
- Storage shelf rack requirements
- Determining rack locations
- Installing the storage shelf rails
- Installing the storage shelf or shelves into a rack
- Understanding appliance and storage shelf connections
- Connecting one storage shelf to an appliance
- Connecting two storage shelves to an appliance
- Connecting three storage shelves to an appliance
- Connecting four storage shelves to an appliance
- Connecting the network cables
- Connecting the power cords
- Turning on the hardware and verifying operation
- Appendix B. Adding storage shelves to an operating appliance that has at least one storage shelf attached
- Appendix C. Adding the disk space of additional storage shelves
- Index
Understanding appliance and storage shelf connections
You cannot use SAS-2 cables with the storage shelf. You must use the SAS-3 cables that are provided with each storage shelf.
Note:
The cables in the illustrations in the following sections are shown in different colors for demonstration purposes only. The actual cables are black.
The External RAID PCIe ports on the rear panel of the appliance are in Slot 1 of Riser 2.
There are two I/O module canisters in the middle of the rear panel of the storage shelf. Each I/O module includes three mini-SAS HD ports.
The mini-SAS HD ports on the top I/O module canister are labeled A, B, and C from left to right.
The mini-SAS HD ports on the bottom I/O module canister are labeled in reverse order; C, B, and A from left to right.
The orientation of the blue tab that is attached to the SAS-3 cable connector is very important.
The SAS-3 cable blue tab should align with the white SAS-3 cable label on the I/O module. Hence, ensure that the blue tab is on the same side of the SAS-3 cable as the SAS-3 label when the cable is connected.
The steps in the following sections assume that the appliance and one or more storage shelves are shipped together and installed at the same time.
Refer to the following sections as needed.