Veritas NetBackup™ 5240 Appliance Hardware Installation Guide
- Hardware overview
- Preinstallation requirements
- Customer-provided environment and supplies
- Storage shelf shipping container contents
- Appliance shipping container contents
- Enabling SAS tape-out functionality
- Determining rack locations
- Best practices for rack installation
- Heat dissipation
- Verifying SAS-3 cable length
- Prerequisites for IPMI configuration on a 52xx and 5330
- Installation procedures
- Installing the storage shelf rack rails
- Installing the storage shelf into a rack
- Installing the appliance rack rails
- Installing the appliance into a rack
- Attaching the storage shelf bezel
- Understanding appliance and storage shelf connections
- Connecting an appliance to one storage shelf
- Connecting an appliance to more than one storage shelf
- Connecting the network cables
- Connecting the power cords
- Turning on the hardware and verifying operation
- Configuring the IPMI port from the NetBackup Appliance Shell Menu
- Accessing and using the Veritas Remote Management interface
- Appendix A. Adding one or more storage shelves to an operating appliance that does not have any storage shelves
- Overview
- Preparing the appliance
- Removing the appliance cover
- Installing the Expansion Storage Kit components
- Reinstalling the appliance into the rack
- Storage shelf rack requirements
- Determining rack locations
- Installing the storage shelf rails
- Installing the storage shelf or shelves into a rack
- Understanding appliance and storage shelf connections
- Connecting one storage shelf to an appliance
- Connecting two storage shelves to an appliance
- Connecting three storage shelves to an appliance
- Connecting four storage shelves to an appliance
- Connecting the network cables
- Connecting the power cords
- Turning on the hardware and verifying operation
- Appendix B. Adding storage shelves to an operating appliance that has at least one storage shelf attached
- Appendix C. Adding the disk space of additional storage shelves
- Index
Customer-provided environment and supplies
For best ventilation, the rack cabinet:
Should be at least 100 cm (4 feet) from walls
Should have at least 100 cm (4 feet) from other cabinets on the front and back of the appliance and the storage shelves
Data centers with two-foot spaces in the front and in the back of the appliances are acceptable with proper cooling and ventilation.
Refer to the following section for more details.
See Heat dissipation.
The following describes the necessary personnel and equipment that are needed at the installation site:
At least two people or a mechanical lift to move the appliance and the storage shelves.
Ethernet and Fibre Channel (FC) cables to connect the appliance to your corporate network.
Optional: For SAS tape-out capability only. A SAS cable with at least one SAS-3 connector. The second connector can be SAS-2 or SAS-3 depending on the type of tape-out device the customer uses.
A USB-keyboard and a monitor to connect to the appliance.
A 19-inch rack with dual Power Distribution Units (PDUs) with 120VAC or 220VAC power supplies.