Veritas NetBackup™ 5230 Appliance Hardware Installation Guide

Last Published:
Product(s): Appliances (Version Not Specified)
Platform: 5230
  1. Overview
    1.  
      Product overview
    2.  
      Appliance front panel
    3.  
      Appliance rear panel
    4.  
      PCIe riser assemblies and slots
    5.  
      3U16 storage shelf
    6.  
      2U12 storage shelf
    7.  
      Product documentation
  2. Preparing for hardware installation
    1.  
      Tools
    2.  
      Hardware installation flow
    3.  
      3U16 storage shelf weights and dimensions
    4.  
      Rack guidelines
    5.  
      Power supply overview
    6.  
      Electrical safety
    7.  
      Heat dissipation
    8.  
      Checking the shipping packages
    9.  
      Removing the protective film from the 3U16 storage shelf
    10.  
      Locating hardware serial numbers
    11.  
      Prerequisites for IPMI configuration on a 52xx and 5330
  3. Installing an appliance and 3U16 storage shelves into racks
    1.  
      Precautions - heavy equipment
    2.  
      Installing the 3U16 storage shelf guide rails
    3.  
      Installing the 3U16 storage shelf into a rack
    4.  
      Installing the appliance guide rails
    5.  
      Installing the appliance into a rack
  4. Cables
    1.  
      About the cables
    2.  
      Connecting the VGA cable
    3.  
      Connecting the network cables
    4.  
      Connecting the appliance to one or more 3U16 storage shelves
    5.  
      Connecting the small form-factor pluggable (SFP+) transceivers
    6.  
      Connecting the power cables
  5. Verifying hardware operation and configuring IPMI
    1.  
      Hardware verification
    2.  
      Turning on the storage shelves
    3.  
      Turning on the appliance
    4.  
      Configuring the IPMI port from the NetBackup Appliance Shell Menu
    5.  
      Accessing and using the Veritas Remote Management interface
  6. Appendix A. Adding 3U16 storage shelves to an operational NetBackup 5230 Appliance
    1.  
      About adding 3U16 storage shelves to an operational appliance
    2.  
      Shutting down the appliance
    3.  
      Preparing the appliance to install the additional hardware
    4.  
      Installing the additional memory
    5.  
      Installing the additional Maintenance-Free Backup Unit (MFBU)
    6.  
      Installing the external RAID controller card
    7.  
      Removing the protective film from the storage shelf
    8.  
      Installing 3U16 storage shelves into the rack
    9.  
      Connecting the 3U16 shelves to an appliance or to other 3U16 shelves
    10.  
      Connecting the 3U16 storage shelf and appliance power cords
    11.  
      Turning on the hardware and verifying operation
  7. Appendix B. Adding 2U12 storage shelves to an operational NetBackup 5230 Appliance
    1.  
      About adding 2U12 storage shelves to an operational appliance
    2.  
      Shutting down the appliance
    3.  
      Preparing the appliance to install the additional hardware
    4.  
      Installing the additional memory
    5.  
      Installing the additional Maintenance Free Backup Unit (MFBU)
    6.  
      Installing the external RAID controller card
    7.  
      Installing 2U12 storage shelves into the rack
    8.  
      Connecting the 2U12 shelves to an appliance or other storage shelves
    9.  
      Connecting the 2U12 storage shelf and appliance power cords
    10.  
      Turning on the hardware and verifying operation
  8. Appendix C. Adding new disk space to the appliance configuration
    1.  
      Adding the disk space of additional storage shelves from the NetBackup Appliance Web Console
    2.  
      Adding the disk space of additional storage shelves from the NetBackup Appliance Shell Menu

Installing the 3U16 storage shelf guide rails

The 3U16 storage shelf is shipped with left and right mounting rails. These rails install in a standard 19-inch rack. The front plates of the rails are marked left and right. Two-inch lips on the bottoms of the rails provide a shelf on which the storage system sits. Extenders that are built into the rails let you adjust the rails for the depth of the rack.

Caution:

Due to the weight of the units, Veritas recommends that storage shelves be installed at or near the bottom of the rack.

Requirements

  • 19-inch equipment rack

  • Available 3U slot

  • Six M5 screws (provided)

  • Six cage nuts (provided)

  • Number 2 Phillips screwdriver

  • Flashlight

To install the 3U16 storage shelf guide rails

  1. Determine the installation positions of the guide rails in the rack.

    This list describes the components in the diagram.

    Number

    Description

    1

    Location of a screw on the rear of the storage shelf handle. Insert the screw here to connect the bottom of the rail to the rack. The shelf sits on the ledge of the rail.

    2

    Location of a second screw to hold the storage shelf to the rack.

  2. Locate the left mounting rail in the box in which the 3U16 storage shelf is shipped. The mounting plate at the front end of the rail is marked Front Left.
  3. Install snap-in cage nuts in the rack as follows:
    • Locate the M5 snap-in cage nuts in the package in which the storage shelf was sent.

    • Identify the bottom third of the 3U section in the front and back of the rack where you want to install the storage shelf.

      Note:

      The mounting rails are 1U high. The holes that are used to secure the rail in the rack are in the middle of that height.

    • From the inside of the rack, insert snap-in cage nuts in cutouts in the front and back where you want to install the mounting rail. Make sure that the nuts are installed at the same level.

  4. Orient the left mounting rail so that the lip is at the bottom and on the inside of the rack. You can adjust the length of the rail to fit the depth of the rack.

    Note:

    The lip on the rail that supports the 3U16 storage shelf must be on the inside of the rack and at the bottom of the rail.

  5. Align the screw holes in the rail with the snap-in cage nut that you installed in the rack.
  6. Insert M5 screws and tighten. Screws are shipped with the unit.
  7. Repeat Steps 1 through 6 for the right mounting rail. Be sure that rails are installed at the same height.