Please enter search query.
Search <book_title>...
Veritas NetBackup™ 5230 Appliance Hardware Installation Guide
Last Published:
2019-06-24
Product(s):
Appliances (Version Not Specified)
Platform: 5230
- Overview
- Preparing for hardware installation
- Installing an appliance and 3U16 storage shelves into racks
- Cables
- Verifying hardware operation and configuring IPMI
- Appendix A. Adding 3U16 storage shelves to an operational NetBackup 5230 Appliance
- Appendix B. Adding 2U12 storage shelves to an operational NetBackup 5230 Appliance
- Appendix C. Adding new disk space to the appliance configuration
Electrical safety
Use the following best practices to ensure that your environment has the correct electrical setup.
Verify proper grounding for the main AC power supply.
Overcurrent and overload protection must be available for the entire system.
The circuits and the associated circuit breakers must provide enough power and overload protection.
Separate the power supply from other large distribution loads or engines to prevent possible damage to the appliance. Examples of systems that have a large power draw include air-conditioners, elevators, or factory machines.