Veritas™ Resiliency Platform 2.2 Deployment Guide
- Section I. Overview and planning
- Overview of Resiliency Platform
- Recovery to premises using third-party replication technologies
- Recovery to premises using Resiliency Platform Data Mover
- Recovery to AWS using Resiliency Platform Data Mover
- Recovery to vCloud Using Resiliency Platform Data Mover
- System requirements
- Section II. Deploying and configuring the virtual appliances
- Section III. Setting up and managing the resiliency domain
- Setting up the resiliency domain
- Managing Infrastructure Management Servers
- Managing NetBackup and NetBackup Appliances
- Adding NetBackup master server
- Managing Veritas InfoScale Operations Manager Server
- Managing Resiliency Platform Data Mover gateway pairing
- Setting up the resiliency domain
- Section IV. Adding the asset infrastructure
- Managing asset infrastructure
- Preparing and maintaining host assets
- Managing Hyper-V virtualization server assets
- Managing VMware virtualization server assets
- About adding a host for discovery of VMware servers
- Managing enclosure assets
- About the discovery host for enclosures
- Configuration prerequisites for adding storage enclosures to an IMS
- Adding storage enclosures
- Adding RecoverPoint appliance for replication
- Managing asset infrastructure
- Section V. Managing users and global product settings
- Managing licenses
- Managing user authentication and permissions
- Configuring authentication domains
- Managing service objectives
- Managing reports
- Managing settings
- Section VI. Updating or uninstalling the product
- Updating Resiliency Platform
- Using YUM virtual appliance as YUM server
- Uninstalling Resiliency Platform
- Updating Resiliency Platform
- Section VII. Troubleshooting and maintenance
- Troubleshooting and maintenance
- Displaying risk information
- Troubleshooting and maintenance
- Section VIII. Reference
Hitachi configuration prerequisites
For the Infrastructure Management Server (IMS) to discover Hitachi TrueCopy storage arrays, ensure that your storage network's physical connections and device settings are properly configured.
The physical connection requirements are as follows:
Fiber channel or Small Computer System Interface (SCSI) should directly attach the hosts to the Hitachi TrueCopy array that contains the TrueCopy P-VOL / S-VOL devices.
The device setup requirements include the following:
The host must be configured with Command Control Interface (CCI) provided by Hitachi TrueCopy.
The IMS discovers all Hitachi storage arrays with a Fiber Channel or SCSI connection to a discovery host where CCI is installed. It discovers TrueCopy as well as Shadow Instances of Hitachi.
The IMS Supports TrueCopy on all microcode levels on all the arrays, only if the host, HBA, and array combination is supported by Hitachi.
Veritas Resiliency Platform supports All Levels of CCI for IMS discovery of the Hitachi TrueCopy storage enclosures.
To discover and manage Hitachi TrueCopy/HUR replication technology, you need to create appropriate HTC/HUR device groups on hosts which have Hitachi Command Devices mapped. Device groups need to be defined on such hosts in both the production and recovery data centers. You must add these hosts to the local IMSs so that Resiliency Platform can discover the device groups.
See Adding application hosts .
For more information on requirements for array-based replication, see the Solutions guides.