NetBackup™ Access 3360 Appliance Hardware Installation Guide
- Overview
- About the Veritas Access 3360 Appliance
- Supported software
- Access 3360 compute node and 5U84 storage shelves
- Access 3360 compute node disk drives
- About the compute node control panel
- Access 3360 compute node rear panel
- 5U84 storage shelf drawers and disk drives
- 5U84 storage shelf control panel
- 5U84 storage shelf rear panel
- 5U84 storage shelf RAID controller
- 5U84 storage shelf Expansion module
- Cables and connectors
- About IPMI configuration
- Pre-installation requirements
- Hardware installation procedures
- Overview
- Installing a storage shelf
- Installing disk drives into a storage shelf
- Installing the storage shelf bezels
- Installing the compute node rack rails
- Installing the compute node into a rack
- Connecting the hardware to one compute node
- Connecting the hardware to two compute nodes
- Connecting Access nodes to the network
- Connecting the power cords to the hardware
- Turning on the hardware and verifying operation
- Configuring the IPMI port
- Accessing and using the Veritas Remote Management interface
- Appendix A. Adding Expansion Storage Shelves to an operating appliance that does not have any Expansion shelves
- Appendix B. Adding Expansion Storage Shelves to an operating appliance that has at least one operating Expansion shelf
- Overview
- Turning off the existing hardware
- Installing the hardware
- Connecting one Expansion shelf to a system that has one existing Expansion shelf
- Connecting two Expansion shelves to a system that has one existing Expansion shelf
- Connecting one Expansion shelf to a system that has two existing Expansion shelves
- Appendix C. Configuring the disk space after adding one or more new Expansion Storage Shelves
Compute node shipping container contents
Each compute node and each storage shelf is shipped in separate containers. Each container includes other boxes and contents. The disk drives are installed into the compute node at the factory.
The following items ship within the compute node box.
QR code card that includes links to the following items:
Veritas Appliance Getting Started documents (https://www.veritas.com/content/support/en_US/article.100053037) such as deployment plans and cabling posters
Appliances Support page (https://www.veritas.com/content/support/en_US/dpp.Appliances) that links to the appliance documentation and other resources
Envelope containing:
Warranty agreement
Environmental compliance statement
USB drive with factory image
Hardware such as:
Rack templates
Rack rails and mounting hardware
Four SAS-3 cables
Two power cords
Bezel