Please enter search query.
Search <book_title>...
NetBackup™ Access 3360 Appliance Hardware Installation Guide
Last Published:
2025-10-13
Product(s):
Appliances (8.5, 8.4, 8.3, 8.2)
Platform: Veritas 3360
- Overview
- About the Veritas Access 3360 Appliance
- Supported software
- Access 3360 compute node and 5U84 storage shelves
- Access 3360 compute node disk drives
- About the compute node control panel
- Access 3360 compute node rear panel
- 5U84 storage shelf drawers and disk drives
- 5U84 storage shelf control panel
- 5U84 storage shelf rear panel
- 5U84 storage shelf RAID controller
- 5U84 storage shelf Expansion module
- Cables and connectors
- About IPMI configuration
- Pre-installation requirements
- Hardware installation procedures
- Overview
- Installing a storage shelf
- Installing disk drives into a storage shelf
- Installing the storage shelf bezels
- Installing the compute node rack rails
- Installing the compute node into a rack
- Connecting the hardware to one compute node
- Connecting the hardware to two compute nodes
- Connecting Access nodes to the network
- Connecting the power cords to the hardware
- Turning on the hardware and verifying operation
- Configuring the IPMI port
- Accessing and using the Veritas Remote Management interface
- Appendix A. Adding Expansion Storage Shelves to an operating appliance that does not have any Expansion shelves
- Appendix B. Adding Expansion Storage Shelves to an operating appliance that has at least one operating Expansion shelf
- Overview
- Turning off the existing hardware
- Installing the hardware
- Connecting one Expansion shelf to a system that has one existing Expansion shelf
- Connecting two Expansion shelves to a system that has one existing Expansion shelf
- Connecting one Expansion shelf to a system that has two existing Expansion shelves
- Appendix C. Configuring the disk space after adding one or more new Expansion Storage Shelves
Installing the compute node into a rack
After the storage shelves and the compute node rails have been installed, you can install the compute node into the rack. These instructions apply to a one-node system and to a multi-node system.
To install the compute node into the rack
- Verify that the rails are securely attached.
Verify that the outer rail is securely attached to the rack.
Verify that the inner rail is securely attached to the compute node.
- Place the hardware in the front of the rack.
- Slide the blue tab forward to unlock the intermediate rail.
- Pull the intermediate portion of rail the rail forward. Ensure that the ball bearing retainer on the intermediate rail is locked forward.
Note:
You do not need to extend the rails as far as they can possibly extend. You only need sufficient space to place the hardware into the rails.
- Align the compute node inner rail to the intermediate rail in the rack. Slide the inner rail that is attached to compute node forward into the intermediate rail until a hard stop is encountered.
The rail has a lock mechanism that prevents the hardware from being fully pushed into the rack.
- Slide the blue tab to unlock the rails and continue the sliding of the compute node into the rack.
- Secure the captive screws on the compute node ears.