Please enter search query.
Search <book_title>...
Veritas™ 5250 Appliance Hardware Installation Guide
Last Published:
2024-08-21
Product(s):
Appliances (Version Not Specified)
Platform: Veritas 5250
- Hardware overview
- Preinstallation requirements
- Customer-provided environment and supplies
- Appliance shipping container contents
- Storage shelf shipping container contents
- Best practices for rack installation
- Determining rack locations
- Storage shelf rack requirements
- Heat dissipation
- Verifying SAS-3 cable length
- Prerequisites for IPMI configuration
- S Series Appliance installation procedures
- Installing the storage shelf rack rails
- Installing the storage shelf into a rack
- Attaching the storage shelf bezel
- Installing the appliance rack rails
- Installing the appliance into a rack
- Understanding appliance and S Series Storage Shelf connections
- Connecting an appliance to one storage shelf
- Connecting an appliance to more than one storage shelf
- D Series Appliance installation procedures
- Installing the storage shelf rack rails
- Installing the storage shelf into a rack
- Installing the appliance rack rails
- Installing the appliance into a rack
- Understanding appliance and D Series Storage Shelf connections
- Connecting an appliance to one storage shelf
- Connecting an appliance to more than one storage shelf
- Next steps after installation
- Connecting the network cables
- Connecting the power cords
- Turning on the hardware and verifying operation
- Configuring the IPMI port from the NetBackup Appliance Shell Menu
- Configuring the Veritas Remote Management Interface from a Flex Appliance
- Configuring the Veritas Remote Management Interface using laptop
- Accessing and using the Veritas Remote Management interface
- Appendix A. Adding one or more storage shelves to an operating appliance that does not have any storage shelves
- Overview
- Preparing the appliance
- Removing the appliance cover
- Installing the Expansion Storage Kit components
- Replacing the appliance cover
- Connecting the S Series storage shelves to the appliance
- Connecting one S Series storage shelf to an appliance
- Connecting two S Series storage shelves to an appliance
- Connecting three S Series storage shelves to an appliance
- Connecting four S Series storage shelves to an appliance
- Connecting the fifth S Series storage shelf to an appliance
- Connecting the sixth S Series storage shelf to an appliance
- Connecting the D Series storage shelves to the appliance
- Connecting one D Series storage shelf to an appliance
- Connecting two D Series storage shelves to an appliance
- Connecting three D Series storage shelves to an appliance
- Connecting four D Series storage shelves to an appliance
- Connecting the fifth D Series storage shelf to an appliance
- Connecting the sixth D Series storage shelf to an appliance
- Appendix B. Adding storage shelves to an operating appliance that has at least one storage shelf attached
- Overview
- Moving the MSDP partition from a base disk to an expansion disk for optimum performance
- Additional storage shelf scenarios
- Installing S Series storage shelves to an appliance that has at least one storage shelf
- Recabling to connect additional S Series storage shelves
- Installing D Series storage shelves to an appliance that has at least one storage shelf
- Recabling to connect additional D Series storage shelves
- Appendix C. Configuring the disk space for new NetBackup Expansion Storage Shelves
- Appendix D. Configuring the disk space for new Flex Expansion Storage Shelves
- Index
Installing the storage shelf rack rails
Use the following procedure to install the storage shelf rack rails. Ensure that the best practices for installing the rack rails are followed.
See Storage shelf rack requirements.
To install storage shelf rails
- Position one of the rail's rear flange in the rear of the rack post and align it to two Rack U spaces and press it into the holes. There will be an audible "click" that assures correct placement. Repeat this process on the other side of the rack.
- Repeat this process at the front rack post on the same sides of the rack as the above step. Ensure the alignment of the Rack U spaces and press it in the same way as above step ensuring an audible click.
- If a change in location on the rack is required, pull on the blue release latch on each rail to unseat the rails.