Please enter search query.
 
              Search <book_title>...
            
 
          InfoScale™ 9.0 Cluster Server Implementation Guide for Oracle - Windows
                Last Published: 
				2025-04-13
                
              
              
                Product(s): 
				InfoScale & Storage Foundation (9.0)
                 
              
              
                Platform: Windows
              
            - Introducing the VCS agents for Oracle and NetApp
- Installing and configuring VCS
- Installing and configuring Oracle- About installing Oracle
- Prerequisites for installing Oracle
- Installing Oracle
- About creating and configuring Oracle
- Prerequisites for configuring Oracle
- Configuring Microsoft iSCSI initiator
- Managing storage using Windows Logical Disk Manager
- Managing storage using NetApp filer
- Creating a temporary service group
- Configuring Oracle on the first node- Dismounting a volume
- Bringing the temporary service group online
- Creating the Oracle database on shared disks
- Creating the listener service
- Configuring the listeners to use the virtual IP address
- Associating the database with the listener
- Configuring the Oracle database
- Configuring the Oracle and listener services
- Disconnecting virtual disks from the first node
- Releasing disks (if you use Windows LDM)
 
- Configuring Oracle on failover nodes
 
- Configuring the Oracle service group
- Administering the Oracle service group
- Troubleshooting
- Appendix A. Resource type definitions
- Appendix B. Sample configuration
- Appendix C. Oracle Enterprise Manager 10g Grid Control with VCS- About Oracle Enterprise Manager 10g Grid Control with VCS
- Installing the VCS agent for Oracle
- Installing Oracle Enterprise Manager server
- Installing Oracle
- Installing the Oracle Management Agent
- Creating and configuring Oracle database and listener on the first node
- Configuring Oracle on failover nodes
- Configuring the Oracle service group
- Configuring a virtual network name
- Configuring the listener for virtual network name
- Configuring the database service for virtual network name
- Configuring an additional Oracle management agent
- Adding the database to the OEM 10g Grid Control
- Making the additional agent highly available
 
Prerequisites for installing Oracle
Note the following prerequisites for installing Oracle in a VCS environment:
- Verify all nodes have adequate resources to run Oracle and VCS. 
- Verify that the InfoScale product is installed on all nodes in the cluster. Refer to the Arctera InfoScale™ Installation and Upgrade Guide for installation steps. 
- Verify you have run the VCS Cluster Configuration Wizard (VCW) to configure VCS on all nodes. 
More Information
Configuring the cluster using the Cluster Configuration Wizard