Important Update: Cohesity Products Documentation
All Cohesity product documentation are now managed via the Cohesity Docs Portal: https://docs.cohesity.com/HomePage/Content/home.htm. Some documentation available here may not reflect the latest information or may no longer be accessible.
NetBackup™ for KVM Administrator's Guide
- Introduction
- Installation and configuration overview
- Managing KVM hosts
- Configuring RBAC roles for KVM administrators
- Protecting KVM virtual machines
- About configuring a backup policy for KVM
- About automatic virtual machine selection
- Add a policy for KVM
- About policy attributes
- Schedule properties
- Add KVM hosts to a policy
- Configure a query to select KVM virtual machines for backup
- Backup options on the KVM attributes tab
- View the protection status of KVM virtual machines
- Perform a manual backup
- Recovering KVM virtual machines
- Troubleshooting KVM backups and recovery
Schedule properties
Table: Description of schedule properties
Property | Description |
|---|---|
| Specifies the type of backup that this schedule can control. The selection list shows only the backup types that apply to the policy you want to configure. |
| You can schedule an automatic backup in one of the following ways:
|
Specifies a retention period to keep backup copies of files before they are deleted. The retention level also denotes a schedule priority within the policy. A higher level has a higher priority. Set the time period to retain at least two full backups of your database. In this way, if one full backup is lost, you have another full backup to restore. For example, if your database is backed up once every Sunday morning, you should select a retention period of at least 2 weeks. The retention period for an application backup schedule refers to the length of time that NetBackup keeps backup images. The retention period for an automatic schedule controls how long NetBackup keeps records of when scheduled backups occurred. For example, if your database is backed up once every Sunday morning, you should select a retention period of at least 2 weeks. | |
Effect of type of schedule on retention period | The type of schedule you select affects the retention period as follows:
|