Veritas™ 5260 Appliance Hardware Installation Guide
- Hardware overview
- Preinstallation requirements
- Customer-provided environment and supplies
- Appliance shipping container contents
- Storage shelf shipping container contents
- Best practices for rack installation
- Determining rack locations
- Storage shelf rack requirements
- Heat dissipation
- Verifying SAS-3 cable length
- Prerequisites for IPMI configuration
- Installation procedures
- Installing the storage shelf rack rails
- Installing the storage shelf into a rack
- Installing the appliance rack rails
- Installing the appliance into a rack
- Understanding appliance and storage shelf connections
- Connecting an appliance to one storage shelf
- Connecting an appliance to more than one storage shelf
- Next steps after installation
- Connecting the network cables
- Connecting the power cords
- Turning on the hardware and verifying operation
- Configuring the Veritas Remote Management Interface from a Flex Appliance
- Configuring the Veritas Remote Management Interface using laptop
- Accessing and using the Veritas Remote Management interface
- Appendix A. Adding one or more storage shelves to an operating appliance that does not have any storage shelves
- Appendix B. Adding storage shelves to an operating appliance that has at least one storage shelf attached
- Appendix C. Configuring the disk space for new Flex Expansion Storage Shelves
- Index
Removing the appliance cover
The system ships from the factory with the front system cover and back system cover screwed to the chassis. A total of four screws, one on each side of the front cover and one on each side of the back cover, need to be removed to detach each top cover panel from the chassis.
Note:
This service will require the removal of the front panel.
Use the following procedures to remove the cover from the appliance.
To remove the appliance cover panels
- For each top cover panel:
While pushing down on both the left and right buttons of the given top panel (see Letter A), slide the top cover panel towards the front (front panel) or back (back panel) of the chassis (see Letter B).
Carefully lift the top cover panel up and away from the chassis.
Note:
Each top cover panel can slide along the chassis base for 10 mm and then needs to be lifted.