Please enter search query.
Search <book_title>...
Veritas™ 5260 Appliance Hardware Installation Guide
Last Published:
2025-04-07
Product(s):
Appliances (Version Not Specified)
Platform: Veritas 5260
- Hardware overview
- Preinstallation requirements
- Customer-provided environment and supplies
- Appliance shipping container contents
- Storage shelf shipping container contents
- Best practices for rack installation
- Determining rack locations
- Storage shelf rack requirements
- Heat dissipation
- Verifying SAS-3 cable length
- Prerequisites for IPMI configuration
- Installation procedures
- Installing the storage shelf rack rails
- Installing the storage shelf into a rack
- Installing the appliance rack rails
- Installing the appliance into a rack
- Understanding appliance and storage shelf connections
- Connecting an appliance to one storage shelf
- Connecting an appliance to more than one storage shelf
- Next steps after installation
- Connecting the network cables
- Connecting the power cords
- Turning on the hardware and verifying operation
- Configuring the Veritas Remote Management Interface from a Flex Appliance
- Configuring the Veritas Remote Management Interface using laptop
- Accessing and using the Veritas Remote Management interface
- Appendix A. Adding one or more storage shelves to an operating appliance that does not have any storage shelves
- Appendix B. Adding storage shelves to an operating appliance that has at least one storage shelf attached
- Appendix C. Configuring the disk space for new Flex Expansion Storage Shelves
- Index
Appliance shipping container contents
The appliance and each storage shelf are shipped in separate containers. Each container includes other boxes and contents. The disk drives are installed into the appliance and the storage shelf at the factory.
The following items ship within the appliance box.
QR code card that includes links to the following items:
Veritas Appliance Getting Started documents (https://www.veritas.com/content/support/en_US/article.100053037) such as deployment plans and cabling posters
Appliances Support page (https://www.veritas.com/content/support/en_US/dpp.Appliances) that links to the appliance documentation and other resources
Envelope containing the following:
Warranty and license information
Accessory box containing rack rails
Two power cables
Two screws
Bezel