Please enter search query.
Search <book_title>...
Veritas Access 3340 Appliance Hardware Installation Guide
Last Published:
2018-09-30
Product(s):
Appliances (Version Not Specified)
Platform: 3340
- Overview
- Pre-installation requirements
- Hardware installation procedures
- Appendix A. Adding storage shelves to an operating appliance that does not have any storage shelves
- Appendix B. Adding storage shelves to an operating appliance that has at least one operating storage shelf
- Appendix C. Configuring the disk space after adding one or more new Expansion Storage Shelves
Compute node shipping container contents
Each compute node and each storage shelf is shipped in separate containers. Each container includes other boxes and contents. The disk drives are installed into the compute node at the factory.
The following items ship within the compute node box.
Open Me First envelope, containing:
Deployment plan that provides basic information and links to detailed information
Cable straps
Envelope containing:
Warranty agreement
Environmental compliance statement
USB drive with factory image
Hardware such as:
Hardware cable connections poster
Rack templates
Rack rails and mounting hardware
Four SAS3 cables
Two power cords
Bezel