Veritas™ 5360 Appliance Hardware Installation Guide
- Hardware overview
- About the appliance and the storage shelves
- Compute node drives
- About the 5360 Appliance control panel
- Compute node rear panel
- 5U84 storage shelf drawers and disk drives
- 5U84 storage shelf control panel
- 5U84 storage shelf rear panel
- 5U84 storage shelf RAID controller
- 5U84 storage shelf Expansion module
- Cables and connectors
- About IPMI configuration
- Preinstallation requirements
- Customer-provided environment and supplies
- Appliance shipping container contents
- Storage shelf shipping container contents
- Dimensions and determining rack locations
- Best practices for rack installation
- Storage shelf rack requirements
- Heat dissipation
- Cable length verification
- Prerequisites for IPMI configuration
- Hardware installation procedures
- Overview
- Installing a storage shelf
- Installing disk drives into a full-capacity storage shelf
- Installing disk drives and blanks into a half-capacity storage shelf
- Installing disk drives into a half-capacity storage shelf
- Installing the compute node rack rails
- Installing the compute node into a rack
- Connecting the hardware to one compute node
- Connecting the hardware to two compute nodes
- Connecting Flex nodes to the network
- Connecting the power cords
- Turning on the hardware and verifying operation
- Configuring the Veritas Remote Management Interface from a Flex Appliance
- Configuring the Veritas Remote Management Interface using laptop
- Accessing and using the Veritas Remote Management interface
- Appendix A. Adding Expansion Storage Shelves to an operating appliance that does not have any Expansion shelves
- Appendix B. Adding Expansion Storage Shelves to an operating appliance that has at least one operating Expansion shelf
- Overview
- Turning off the existing hardware
- Installation instructions
- Connecting one Expansion Shelf to a system that has one existing Expansion Shelf
- Connecting two Expansion Shelves to a system that has one existing Expansion Shelf
- Connecting one Expansion Shelf to a system that has two existing Expansion Shelves
- Appendix C. Configuring the disk space for new Flex Expansion Storage Shelves
Heat dissipation
Air flows from the front of each unit and exits from the rear of each unit. You can install the optional bezel without disruption to the airflow.
For best ventilation, the rack cabinet should:
Be at least 100 cm (4 feet) from walls.
Be at least 100 cm (4 feet) from other cabinets on the front and back of the appliance and the storage shelves.
Note:
Data centers with two-foot spaces in the front and in the back of the appliances are acceptable with proper cooling and ventilation.
Veritas provides the following requirements to ensure sufficient cooling.
Veritas requires that you install the system in a National Engineering Manufacturer's Association (NEMA)-certified or equivalent rack.
A minimum of 3 inches (7.6 cm) of space must be between the front of an appliance and the cabinet door or other air block.
A minimum of 6 inches (15.2 cm) of space must be between the rear of an appliance and the cabinet rear or other air block.
A minimum of 1 inch (2.5 cm) of space must be between the front of a storage shelf and the cabinet door or other air block.
A minimum of 2 inches (5.0 cm) of space must be between the rear of a storage shelf and the cabinet rear or other air block.