Please enter search query.
Search <book_title>...
Veritas™ 5360 Appliance Hardware Installation Guide
Last Published:
2024-10-08
Product(s):
Appliances (Version Not Specified)
Platform: Veritas 5360
- Hardware overview
- About the appliance and the storage shelves
- Compute node drives
- About the 5360 Appliance control panel
- Compute node rear panel
- 5U84 storage shelf drawers and disk drives
- 5U84 storage shelf control panel
- 5U84 storage shelf rear panel
- 5U84 storage shelf RAID controller
- 5U84 storage shelf Expansion module
- Cables and connectors
- About IPMI configuration
- Preinstallation requirements
- Customer-provided environment and supplies
- Appliance shipping container contents
- Storage shelf shipping container contents
- Dimensions and determining rack locations
- Best practices for rack installation
- Storage shelf rack requirements
- Heat dissipation
- Cable length verification
- Prerequisites for IPMI configuration
- Hardware installation procedures
- Overview
- Installing a storage shelf
- Installing disk drives into a full-capacity storage shelf
- Installing disk drives and blanks into a half-capacity storage shelf
- Installing disk drives into a half-capacity storage shelf
- Installing the compute node rack rails
- Installing the compute node into a rack
- Connecting the hardware to one compute node
- Connecting the hardware to two compute nodes
- Connecting Flex nodes to the network
- Connecting the power cords
- Turning on the hardware and verifying operation
- Configuring the Veritas Remote Management Interface from a Flex Appliance
- Configuring the Veritas Remote Management Interface using laptop
- Accessing and using the Veritas Remote Management interface
- Appendix A. Adding Expansion Storage Shelves to an operating appliance that does not have any Expansion shelves
- Appendix B. Adding Expansion Storage Shelves to an operating appliance that has at least one operating Expansion shelf
- Overview
- Turning off the existing hardware
- Installation instructions
- Connecting one Expansion Shelf to a system that has one existing Expansion Shelf
- Connecting two Expansion Shelves to a system that has one existing Expansion Shelf
- Connecting one Expansion Shelf to a system that has two existing Expansion Shelves
- Appendix C. Configuring the disk space for new Flex Expansion Storage Shelves
About the Power button LED states
The following table provides a description of each power state.
Table: Power button LED states
State | Power Mode | LED | Description |
|---|---|---|---|
Power - off | Non-ACPI | Off | The system power is off, and the BIOS has not initialized the chipset. |
Power - on | Non-ACPI | On | The system power is on and the green Power button LED is active. |
S0 | ACPI (Advanced Configuration and Power Interface) | Steady on | The system and the operating system are up and running. |
S5 | ACPI (Advanced Configuration and Power Interface) | Off | Mechanical is off and the operating system has not saved any context to the hard disk drive. |