Veritas NetBackup™ Vault Administrator's Guide
- About Vault
- Installing Vault
- Best Practices
- About preferred vaulting strategies
- About how to ensure that data is vaulted
- About not Vaulting more than necessary
- About preparing for efficient recovery
- About avoiding resource contention during duplication
- About how to avoid sending duplicates over the network
- About increasing duplication throughput
- About organizing reports
- Configuring NetBackup Vault
- Configuring Vault
- About Vault configuration
- About configuring Vault Management Properties
- About creating a vault
- About creating profiles
- Configuring a profile
- Vaulting and managing media
- About Vault sessions
- About monitoring a Vault session
- About the list of images to be vaulted
- About ejecting media
- About injecting media
- About using containers
- About vaulting additional volumes
- About using notify scripts
- Creating originals or copies concurrently
- Reporting
- Administering Vault
- About administering access to Vault
- About NetBackup Vault session files
- Using the menu user interface
- Troubleshooting
- Debug logs
- Appendix A. Recovering from disasters
- Appendix B. Vault file and directory structure
Vault fields in bpdbjobs output
The NetBackup activity monitor utility, bpdbjobs, displays Vault jobs by default.
Table: Vault fields in bpdbjobs output shows the Vault-specific fields that you receive if you run the bpdbjobs command and use the -vault option.
Table: Vault fields in bpdbjobs output
Field | Description |
---|---|
| The name of the robot with which the vault is associated. |
| The name of the vault under which the session is running. |
| The name of the profile that holds the configuration information for the vault session. |
| The session ID is a unique numeric value for the vault job. Session ID assignment starts at 1 the first time a vault job is run after vault has been installed. The value increments by 1 every time a new vault job runs. |
| The number of tapes to be ejected for a vault session. If the profile is configured for deferred eject, the tapes may not be ejected yet. |
| For Vault jobs, the field contains one of the following values. These values progress from the first value to the last as the Vault job progresses as follows: |
If a Vault job completes successfully (with exit status = 0), the
field and the field both contain the value . If a vault job fails, the Operation field contains the operation occurring at the time the job failed.