NetBackup™ Web UI Cloud Administrator's Guide
- Managing and protecting cloud assets
- Configure Snapshot Manager in NetBackup
- Managing intelligent groups for cloud assets
- Protecting cloud assets or intelligent groups for cloud assets
- About storage lifecycle policies
- Managing policies for cloud assets
- Configuring the Start window
- Managing cloud policies
- Scan for malware
- Protecting Microsoft Azure resources using resource groups
- NetBackup Accelerator for cloud workloads
- AWS Snapshot replication
- Protecting PaaS assets
- Protecting RDS Custom instances
- Protecting Azure Managed Instance databases
- Limitation and considerations
- Installing the native client utilities
- Configuring storage for different deployments
- Managing PaaS credentials
- Add protection to PaaS assets
- Recovering cloud assets
- Recovering cloud assets
- Recovering AWS or Azure VMs to VMware
- Recovering PaaS assets
- Recovering cloud assets
- Performing granular restore
- Troubleshooting protection and recovery of cloud assets
- Troubleshoot PaaS workload protection and recovery issues
Configuring the include dates
The Include dates tab appears in the Add schedule or Edit schedule tabs. For the tab to display, you must select the option as the on the Attributes tab.
The tab displays a calendar of three consecutive months. Use the lists at the top of the calendar to change the first month or year displayed.
Use the Calendar option in the policy Attributes tab to create a job schedule based on a calendar view. The Include dates tab lets you configure the schedules that run according to specific days, on recurring week days, or on recurring days of the month.
Note:
Using the calendar schedule, if a green circle does not appear on a day, the day is not included in the schedule.
If Retries allowed after run day is enabled, a job may run on a day that is not included in the schedule.
When a new calendar schedule is created with Retries allowed after run day enabled, the schedule runs its first job on the next day when the backup window is open. That day may be before the first run day that is included in the schedule.
To use a calendar to schedule run days:
- In the Attributes tab, enable the Calendar option.
- Select the Include dates tab.
Use one or more methods to schedule the days on which jobs can run:
Select the day(s) on the three-month calendar on which you want the jobs to run. Use the drop-down lists at the top of the calendar to change the months or year.
To indicate Recurring week days:
Click Set all to select all of the days in every month for every year.
Click Clear all to remove all existing selections.
Select a box in the matrix to select a specific day to include for every month.
Click the column head of a day of the week to include that day every month.
Click the 1st, 2nd, 3rd, 4th, or Last row label to include that week every month.
To indicate Recurring days of the month:
Click Set all to select all of the days in every month.
Click Clear all to remove all existing selections.
Check a box in the matrix to select that day to include each month.
Click Last to include the last day of every month.
To indicate Specific dates:
Click New. Enter the month, day, and year in the dialog.
The date appears in the Specific dates list.
To delete a date, select the date in the list. Click Delete.
- Click Add to save the included days.