Please enter search query.
Search <book_title>...
Veritas™ 5350 Appliance Hardware Installation Guide
Last Published:
2024-08-21
Product(s):
Appliances (Version Not Specified)
Platform: Veritas 5350
- Hardware overview
- About the appliance and the storage shelves
- Compute node disk drives
- Compute node rear panel
- Compute node control panel
- 5U84 storage shelf drawers and disk drives
- 5U84 storage shelf control panel
- 5U84 storage shelf rear panel
- 5U84 storage shelf RAID controller
- 5U84 storage shelf Expansion module
- Cables and connectors
- About IPMI configuration
- Preinstallation requirements
- Customer-provided environment and supplies
- Appliance shipping container contents
- Storage shelf shipping container contents
- Dimensions and determining rack locations
- Best practices for rack installation
- Storage shelf rack requirements
- Heat dissipation
- Cable length verification
- Prerequisites for IPMI configuration
- Hardware installation procedures
- Overview
- Installing a storage shelf
- Installing disk drives into a full-capacity storage shelf
- Installing disk drives and blanks into a half-capacity storage shelf
- Installing disk drives into a half-capacity storage shelf
- Installing the compute node rack rails
- Installing the compute node into a rack
- Connecting the hardware to one compute node
- Connecting the hardware to two compute nodes
- Connecting NetBackup nodes to the network
- Connecting Flex nodes to the network
- Connecting the power cords
- Turning on the hardware and verifying operation
- Configuring the IPMI port from the NetBackup Appliance Shell Menu
- Configuring the Veritas Remote Management Interface from a Flex Appliance
- Configuring the Veritas Remote Management Interface using laptop
- Accessing and using the Veritas Remote Management interface
- Appendix A. Adding Expansion Storage Shelves to an operating appliance that does not have any Expansion shelves
- Appendix B. Adding Expansion Storage Shelves to an operating appliance that has at least one operating Expansion shelf
- Overview
- Turning off the existing hardware
- Installation instructions
- Connecting one Expansion Shelf to a system that has one existing Expansion Shelf
- Connecting two Expansion Shelves to a system that has one existing Expansion Shelf
- Connecting one Expansion Shelf to a system that has two existing Expansion Shelves
- Appendix C. Configuring the disk space for new NetBackup Expansion Storage Shelves
- Appendix D. Configuring the disk space for new Flex Expansion Storage Shelves
Overview
This appendix applies to an operating appliance that has one or two compute nodes and a Primary Storage Shelf.
It is possible to already have one or more Expansion Storage Shelves, up to three units. The hardware must be turned off before you add any storage shelves.
The cable scheme for NetBackup and Flex appliances is the same.