Veritas InfoScale 7.3 Installation and Upgrade Guide - Windows
- Preinstallation and planning
- Installing the Veritas InfoScale products
- About installing the InfoScale products
- About the co-existence of InfoScale products
- Installing the server components using the installation wizard
- Applying the selected installation and product options to multiple systems
- Installing the server components using the command-line installer
- Parameters for Setup.exe
- Available product options and supported DMP DSMs
- Registering the InfoScale Storage resource DLLs
- Installing the client components
- Upgrading to InfoScale products
- Performing the post upgrade tasks
- Deployment scenarios and applicable post upgrade tasks
- Re-enabling Volume Replicator in a non-clustered environment
- Re-enabling Volume Replicator in a Microsoft failover cluster environment
- Reconnecting DMP DSM paths after the upgrade
- Reconfiguring the Veritas InfoScale Messaging Service
- Importing the configured rules
- Upgrading the dynamic disk group version
- Upgrading clusters for stronger security
- Reinstalling the custom agents
- Including custom resources
- Administering the InfoScale product installation
- Uninstalling the InfoScale products
- Performing application upgrades in an InfoScale environment
- Upgrading Microsoft SQL Server
- Upgrading Oracle
- Upgrading application service packs in an InfoScale environment
- Appendix A. Services and ports
- Appendix B. Migrating from a third-party multi-pathing solution to DMP
Preparing the secondary site for SFW upgrade in a Windows Server Failover Cluster environment
Perform the following procedure to prepare the nodes on the secondary site for the SFW upgrade in a Windows Server Failover clustered Volume Replicator environment.
To prepare the secondary site
- Take the RVGresource offline by performing one of the following procedures:
From the Cluster Administrator console, right-click the RVG resource and select the Offline option.
From the command line, type:
[cluster resourcename] /Offline [:node name] [/Wait[:timeoutin seconds]]
- Take the Disk Group resource offline on the secondary site by performing one of the following procedures:
From the Cluster Administrator console, right-click the Disk Group resource, and select the Offline option.
From the command prompt, type:
[cluster resourcename] /Offline [:node name] [/Wait[:timeoutin seconds]]
Repeat step 2 to offline the IP resource and then the Network Name resource.
Warning:
Taking the DG(Disk Group) resource offline pauses replication, and if applications continue to run on the primary for too long, this may cause a possible replicator log overflow.
- If the existing replication settings are configured to use TCP, change the settings to use UDP. After both the primary and DR sites are upgraded, you can switch the replication settings back to TCP.
You can now proceed to upgrade SFW on all nodes of the secondary site.