Translation Notice
Please note that this content includes text that has been machine-translated from English. Veritas does not guarantee the accuracy regarding the completeness of the translation. You may also refer to the English Version of this knowledge base article for up-to-date information.
NetBackup 8.2 / 3.2 Hotfix - Backups fail with status 50 and 150 under load after upgrade to 8.2 (Etrack 3983739)
Abstract
Description
Veritas Bug ID: ET 3983739
Issue: All backups fail with status 50 and 150 under load after upgrading to 8.2 (Etrack 3983739)
Problem Description: After upgrading to NetBackup 8.2, the master server drops connections causing backups, including VMWare backups, to fail
Version 3 of this EEB is an EEB Bundle containing fixes from these etracks:
ET3984093 After upgrade to NetBackup 8.2, backups fail when master server is under load
ET4000122 Some Backup are failing with status code 196
Version: NetBackup 8.2
Fixed In: NetBackup 8.3
Installation Location: Master Server
Read me
Version: NetBackup 8.2
Installation Location: Master Server
Installation Instructions:
Using the NetBackup Emergency Engineering Binary (EEB) installer
https://www.veritas.com/docs/100019405
Installing EEBs on a NetBackup 52x0 / 5330 Appliance
https://www.veritas.com/docs/100023444
Downloads:
NB_8.2_ET3983739_3.zip
NBAPP_EEB_ET3983739-3.2.0-3.x86_64.rpm
Checksums of Files
File Checksum Byte count
linuxR_x86/nbpem 1155216134 16113700
linuxS_x86/nbpem 1798218840 16037227
solaris/nbpem 1651389321 33132160
solaris_x86/nbpem 565587937 42972704
AMD64/nbpem.exe 3506104069 7109632
Recommended service state:
Stop all NetBackup services before applying this hotfix.
Update files
|
File name | Description | Version | Platform | Size |
---|